Jan 19, 2017 13:07
7 yrs ago
1 viewer *
English term
payment certificate
English to Czech
Tech/Engineering
Construction / Civil Engineering
stavební výkony
Výkonové fáze (dle výkonového a honorářového řádu)
....
In addition to Performance Phase 8:
On-Site Management (including services according to Annex 3, Service and remuneration code)
Architectural & Civil Engineering
• Monitor the execution of the project for conformance with the building approvals or consents, the execution drawings and project specifications and with the generally acknowledged rules of technology (Standards) and applicable regulations
• Monitor Safety, Health and Environmental (SHE) as defined by local regulations
• Supervise the execution of supporting structures for conformance with the certificate of stability
• Co-ordinate the work of specialists involved in execution of the Works.
• Monitor the correction of details of pre-assembled components
• Produce and monitor progress on a timetable (bar chart )
• Keep a construction diary
• Perform measurements jointly with the building contractor
• Approve and accept building works with the involvement of other specialists involved in both project planning and project supervision; identify defects
• Check Contractor’s *****payment certificates*****
Děkuji za návrhy.
....
In addition to Performance Phase 8:
On-Site Management (including services according to Annex 3, Service and remuneration code)
Architectural & Civil Engineering
• Monitor the execution of the project for conformance with the building approvals or consents, the execution drawings and project specifications and with the generally acknowledged rules of technology (Standards) and applicable regulations
• Monitor Safety, Health and Environmental (SHE) as defined by local regulations
• Supervise the execution of supporting structures for conformance with the certificate of stability
• Co-ordinate the work of specialists involved in execution of the Works.
• Monitor the correction of details of pre-assembled components
• Produce and monitor progress on a timetable (bar chart )
• Keep a construction diary
• Perform measurements jointly with the building contractor
• Approve and accept building works with the involvement of other specialists involved in both project planning and project supervision; identify defects
• Check Contractor’s *****payment certificates*****
Děkuji za návrhy.
Proposed translations
(Czech)
Proposed translations
+2
6 mins
Selected
zjišťovací protokoly k fakturaci
něco takového?
--------------------------------------------------
Note added at 7 mins (2017-01-19 13:14:15 GMT)
--------------------------------------------------
tedy "protokol" (v jedn. č.)
--------------------------------------------------
Note added at 7 mins (2017-01-19 13:14:15 GMT)
--------------------------------------------------
tedy "protokol" (v jedn. č.)
Note from asker:
Děkuji za odpověď. |
3 KudoZ points awarded for this answer.
15 mins
potvrzení o platbyschopnosti
...
Note from asker:
Děkuji za odpověď. |
1 hr
zjišťovací protokol k faktuře
Z praxe
Note from asker:
Děkuji za odpověď. |
3 hrs
potvrzení o platbách
doklad(y) o platbách
Note from asker:
Děkuji za odpověď. |
5 days
potvrzení o platbě
payment certificate = potvrzení o platbě
Something went wrong...