GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
21:31 Feb 25, 2016 |
Serbian to English translations [PRO] Tech/Engineering - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: LogosART Croatia Local time: 01:07 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | executed area development plan/report |
|
executed area development plan/report Explanation: executed area development plan/report Method of erecting buildings According to a further feature of my invention, the floor elements corresponding to the superposed recesses in the dilierent stories, ten stories in the case of Fig. 1, may be executed in superposition on the: ground and inside the vertical projection of the superposed recesses as readily apparent from inspection of Fig. l. To this end, a carefully executed area is prepared on the ground at the desired location so as to form the bottom of amold and there is molded over it between the four sides of a shuttering such as S (Fig. 2),… https://www.google.com/patents/US2964143 executed area report http://www.kairikienergy.com/system/application/assets/docum... executed area LOT No.1 Bicycle path PREPARATORY WORKS PRIPREMNI RADOVI ZAŠTITA POKOSA PRIMJENOM HUMUSNOG MATERIJALA I TRAVNATE VEGETACIJE Zaštita pokosa nasipa, koji je izložen djelovanju malih količina vode primjenom humusnog materijala i travnate vegetacije na površinama određenim projektom. Zaštita se vrši u svemu prema O.T.U. Debljina humusnog sloja određena je projektom i iznosi 15 cm. Nabava, dobava i prijevoz humusnog materijala sa pozajmišta te sav potreban rad i materijal uključeni su u stavku. Obračun radova: Po četvornom metru stvarno izvedene površine SLOPE PROTECTION BY APPLICATION OF TOPSOIL MATERIAL AND GRASS VEGETATION This work includes protection of fill slopes exposed to the activity of small quantities of water. The protection is achieved with application of topsoil material and grassy vegetation on the surfaces specified in the design. Slope protection run as provided in GTC. Thickness of humus layer is determined in the design. The item includes material supply, delivery, spreading and rough levelling of the material. Accounting of works: Per square meter of actually executed area http://www.beli-manastir.hr/pdf/2014/BoQ LOT 1.pdf |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.