GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
14:53 Feb 18, 2009 |
German to English translations [PRO] Tech/Engineering - Materials (Plastics, Ceramics, etc.) | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: David Moore (X) Local time: 07:50 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 +1 | minimum (total) loading |
| ||
2 | minimum overhang |
| ||
2 | minimum length |
|
Discussion entries: 6 | |
---|---|
minimum overhang Explanation: ausladen = to overhang |
| |
Login to enter a peer comment (or grade) |
minimum length Explanation: OK, this is based on your earlier question and the whole context. It sounds like you are selling the logs and this might be a promise that all the logs are at least "45 fm" long (so you are promising not to try to fit some scrawny little twigs in the middle of the big load). I realize, it is a reach from the German, but given your context, you might look into this. |
| |
Login to enter a peer comment (or grade) |
minimum (total) loading Explanation: That would be my suggestion; minimum tonnage amount to be "loaded out from the originating point". Not really overhang, or whatever... -------------------------------------------------- Note added at 1 hr (2009-02-18 16:04:14 GMT) -------------------------------------------------- And the "fM" refers to the cubic quantity of wood to be loaded onto each wagon; it has nothing to do with the length either, as the wagons are up to about 20 metres long, so 45 fM wouldn't go down very well with the railways if it were the length of a log, would it... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.