20:49 Dec 28, 2010 |
English to Hungarian translations [PRO] Tech/Engineering - Environment & Ecology / clearance of mines/munititions in seas | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Katalin Szilárd Hungary Local time: 09:41 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
5 +6 | halriasztó töltetek |
| ||
5 | töltőberendezés halriasztóhoz |
|
fish scaring charges halriasztó töltetek Explanation: 100%-ra mondom, hogy az nem chargers, hanem charges. Lásd a szöveget lent. Ez az infó viszont olyan szempontból "riasztó", hogy ökológiai szempontból eléggé durva módszer. http://www.nord-stream.com/pl/press0/press-releases/press-re...[backPid]=24&cHash=9ab863a5fe Engineering analysis based on the effects of underwater explosion has shown that a mine free “security corridor” 25 metres either side of the pipeline is required to ensure its integrity. The analysis was performed by Nord Stream’s design contractor, SES (Saipem Energy Services) and verified by the certifying body Det Norske Veritas (DNV). Within the security corridor, 27 items in Finnish and one in Swedish waters have been confirmed as unexploded ordnance. Each munitions clearance is planned separately, taking into account its specific characteristics such as size of the charge, water depth etc. Mitigation Measures Keep Environmental Impact to a Minimum # Qualified Marine Mammal Observers provide technical expertise, throughout the project, also on site. # A Health, Safety & Environment advisor ensures that industry ‘best practices’ are followed at all times. # The detailed effects of the detonation are formulated by modelled information for each planned operation. This information will be used to determine acceptable safety distances for all mammals, cultural heritage and existing infrastructure. # Passive Acoustic Monitoring for Marine Mammals will be employed. # Prior to any clearance operations, a survey for fish shoals will be conducted. # Prior to any clearance operations, fish scaring charges and seal scrammers will be used to displace fish and marine mammals. |
| ||
Grading comment
| |||
Notes to answerer
| |||