Apr 21, 2017 15:21
7 yrs ago
English term
Front and rear horizontal bus barrier
English to Russian
Tech/Engineering
Engineering: Industrial
Enclosure installation
If the enclosure is divided in several sections, place the different sections side by side following the correct sequence, and use the appropriate precision to put them alongside: this makes bars junction easier when present.
First of all execute the bars junctions when present, then section consolidation, and finally fasten the enclosure to the floor, using apposite holes and appropriate fixing bolts.
All necessary electrical and structural joining components are provided and the following procedure is recommended.
• Position the first shipping sections into place on the foundation and level.
• Remove the front and rear horizontal bus barrier.
• Position the second shipping section on the foundation adjacent to the first and
level it. The horizontal bus should be inspected for proper positioning and
alignment at this time.
• Connect the shipping sections together, inserting the rubber split on the half top
of switchboard.
• Assemble the bus bar links to join the horizontal bus bur in the two shipping
sections. The horizontal buses may differ in size or plating, therefore, the links
must be matched to the proper bars. All links and associated mounting
hardware are provided for each switchboard.
• Join the ground bus between the two adjacent sections.
• Connect the inter-unit wiring terminal blocks between shipping sections.
If the enclosure is divided in several sections, place the different sections side by side following the correct sequence, and use the appropriate precision to put them alongside: this makes bars junction easier when present.
First of all execute the bars junctions when present, then section consolidation, and finally fasten the enclosure to the floor, using apposite holes and appropriate fixing bolts.
All necessary electrical and structural joining components are provided and the following procedure is recommended.
• Position the first shipping sections into place on the foundation and level.
• Remove the front and rear horizontal bus barrier.
• Position the second shipping section on the foundation adjacent to the first and
level it. The horizontal bus should be inspected for proper positioning and
alignment at this time.
• Connect the shipping sections together, inserting the rubber split on the half top
of switchboard.
• Assemble the bus bar links to join the horizontal bus bur in the two shipping
sections. The horizontal buses may differ in size or plating, therefore, the links
must be matched to the proper bars. All links and associated mounting
hardware are provided for each switchboard.
• Join the ground bus between the two adjacent sections.
• Connect the inter-unit wiring terminal blocks between shipping sections.
Proposed translations
(Russian)
3 +1 | переднее и заднее ограждение горизонтальной шины | Enote |
3 | перегородки горизонтальной шины лицевой/передней и тыльной/задней стороны | Mikhail Zavidin |
Proposed translations
+1
59 mins
Selected
переднее и заднее ограждение горизонтальной шины
...
4 KudoZ points awarded for this answer.
Comment: "Спасибо!"
1 hr
перегородки горизонтальной шины лицевой/передней и тыльной/задней стороны
TIASTAR Motor Control Center
Instruction Guide???
Instruction Guide???
Something went wrong...