kolizja branżowa

English translation: conflicts between disciplines

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Polish term or phrase:kolizja branżowa
English translation:conflicts between disciplines
Entered by: Michał Szewczyk

13:22 Sep 12, 2020
Polish to English translations [PRO]
Tech/Engineering - Construction / Civil Engineering
Polish term or phrase: kolizja branżowa
"Narzędzie BIM pozwala na zachowanie współpracy międzybranżowej tworzonego projektu, wypracowanie spójnych, kompleksowych rozwiązań projektowych oraz zminimalizowanie nieścisłości wynikającymi z wielu niezdefiniowanych w płaskim modelu projektowym kolizji branżowych. "
Michał Szewczyk
Local time: 02:25
conflicts between disciplines
Explanation:
chodzi o kolizje np. instalacji elektrycznych z wodno-kanalizacyjnymi czy wentylacyjnymi, gazowymi
kolizja to conflict, a branża w tym kontekście to discipline (spotyka się też "trade")
Selected response from:

drugastrona
Poland
Local time: 02:25
Grading comment
4 KudoZ points were awarded for this answer



Summary of answers provided
4 +1conflicts between disciplines
drugastrona
4trade collision
Beata Claridge
3interference of trades
Katarzyna Kucharska
Summary of reference entries provided
workflow clashes / general timeline conflicts
geopiet

  

Answers


5 mins   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +1
conflicts between disciplines


Explanation:
chodzi o kolizje np. instalacji elektrycznych z wodno-kanalizacyjnymi czy wentylacyjnymi, gazowymi
kolizja to conflict, a branża w tym kontekście to discipline (spotyka się też "trade")

drugastrona
Poland
Local time: 02:25
Specializes in field
Native speaker of: Native in PolishPolish
PRO pts in category: 359

Peer comments on this answer (and responses from the answerer)
agree  Adrian Liszewski
1 day 16 hrs
  -> dziękuję :)
Login to enter a peer comment (or grade)

6 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
interference of trades


Explanation:
Ja się z takim czymś spotkałam na moich ustnych na budowach.

Example sentence(s):
  • Lost labor productivity claims require a detailed issue analysis in order to assess responsibility for the cause-and-effect relationships. This can be difficult, as more than one party may be responsible and the potential causes are many, including out-of
  • To achieve increased productivity, LBMS plans for continuous work for resources; the completion of work at a location before leaving that area; and the elimination of interference of trades in the samephysical location.

    Reference: http://cpmiteam.com/2002/09/primer-on-labor-productivity/
    https://www.larkgroup.com/manage/
Katarzyna Kucharska
Poland
Local time: 02:25
Specializes in field
Native speaker of: Polish
Login to enter a peer comment (or grade)

13 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
trade collision


Explanation:
Trade collisions happen all the time, and this is why you need clash detection in place. In a 2D workflow, you can’t possibly see how components look in the real world as you are only visually confined to a horizontal and vertical axis. This all changes with the three-dimensional (3D) modelling approach of BIM.


    https://www.ny-engineers.com/vdc-services/cad-to-revit-modeling/virtual-trade-coordination-clash-detection
Beata Claridge
Local time: 12:25
Native speaker of: Native in PolishPolish
PRO pts in category: 47
Login to enter a peer comment (or grade)




Reference comments


40 mins
Reference: workflow clashes / general timeline conflicts

Reference information:
A key benefit of using BIM is the ability to identify any type of clashes early on in projects so that they can be rectified (or resolved) more easily, more quickly, and more cheaply than if work was already in progress.

But even with the availability of sophisticated software that automates the process of clash detection, it’s essential to know what clashes are, why they happen, and how they can be avoided.

What is a clash? There are a myriad of components and building elements that are used to design a building and if any of these are not spatially coordinated they will conflict with one another. Additionally, there can be workflow clashes that result from a conflict in construction sequencing.

Different types of clashes. For convenience, these are defined as:

♦ Hard clashes that involve building components that have been positioned in the same space in two different designs. For example, the structural engineer may have positioned a steel beam in the same position used for pipework by the MEP engineer, or a duct system may intersect electrical conduits. Clash resolution will involve moving one or the other component.
♦ Soft clashes that involve the breach of buffer zones. For instance, an air conditioning unit may need a specified clearance for access, safety, or maintenance, and if a building component of any kind is positioned within the buffer zone it will constitute a soft clash. Clash resolution will involve ensuring the buffer zone complies with the specifications.
♦ Workflow clashes generally involve general timeline conflicts including the scheduling of contractors and delivery of materials and equipment.

- https://www.ny-engineers.com/vdc-services/bim/clash-resoluti...

geopiet
Native speaker of: Native in PolishPolish
PRO pts in category: 803
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search