16:02 Nov 30, 2020 |
|
French to English translations [PRO] Tech/Engineering - Manufacturing / HANDLING INSTRUCTIONS FOR AN ENERGY TURBINE | |||||||
---|---|---|---|---|---|---|---|
|
|
Summary of answers provided | ||||
---|---|---|---|---|
3 -1 | Rock dumping (Placement of rocks/stones) at turbine bases/foundations |
|
Discussion entries: 8 | |
---|---|
Rock dumping (Placement of rocks/stones) at turbine bases/foundations Explanation: As per various sites specializing in wind turbine services, one alternative for anchoring the foundation/base of offshore wind turbines is called rock dumping = the placing of stones/rocks to cover the base of each turbine, thereby holding the structure in place while preventing scouring. *See picture on p.70 of the SNC Lavalin PDF "Offshore Wind Handbook October 2018" (http://https://www.snclavalin.com/~/media/Files/S/SNC-Lavali... illustrating rock dumping along the base of an offshore wind turbine. Example sentence(s):
Reference: http://https://www.offshorewind.biz/2015/03/30/subsea-protec... Reference: http://https://www.snclavalin.com/~/media/Files/S/SNC-Lavali... |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.